H Frame Scaffolding Scaffolding Companies Scaffolding Near Me Portable Scaffolding

H Frame Scaffolding Scaffolding Companies Scaffolding Near Me Portable Scaffolding
  • TIANYINGTAI
  • China
  • 15days - 60days
  • 800,000 Tons

The geometric dimensions of portal steel scaffolding are standardized.
The structure is reasonable, the bearing performance is good, the strength of steel is fully utilized, and the bearing capacity is high.
It is easy to assemble and disassemble during construction, has high erection efficiency, saves time and labor, is safe, reliable, and economical.

H Frame Scaffolding Scaffolding Companies Scaffolding Near Me Portable Scaffolding

We can produce



H Frame Scaffolding Scaffolding Companies Scaffolding Near Me Portable Scaffolding
ClassificationDescriptionSpecificationTheoretical WeightMaterialSurface
Frame scaffoldingA frame scaffolding1219*152410.5kgQ235Powder coating
A frame scaffolding1219*170012.5kgQ235Electro-galvanized
A frame scaffolding1219*193013.6kgQ235Hot dip galvanized
H frame scaffolding1219*9146.7kgQ235Pre galvanized
H frame scaffolding219*152411.2kgQ235
H frame scaffolding1219*170012.3kgQ235
H frame scaffolding1219*193014.6kgQ235
Cross BraceCross Brace21*1.4*13631.9kgQ235Powder coating
Cross Brace21*1.4*17242.35kgQ235Electro-galvanized
Cross Brace21*1.4*19282.67kgQ235Hot dip galvanized
Cross Brace21*1.4*21983kgQ235Pre galvanized



Application of portal scaffolding


1. Construct stereotyped scaffolding;


2. Used as a support frame for beams and slab frames (to bear vertical loads);


3. Construct a movable workbench.


We can process


Precautions for erecting portal scaffolding


1. The foundation of portal scaffolding must be tamped, and drainage slopes should be made to prevent water accumulation


2. The erection sequence of portal scaffolding is: foundation preparation → placement of pad → placement of base → vertical two-sided single-piece door frame → installation of cross bar → installation of scaffolding board → repeated installation of door frame, cross bar, and scaffolding board on this basis .


3. The portal type steel pipe scaffold should be erected from one end to the other end, and the upper step scaffold should be completed after the lower step scaffold is erected. The erection direction is opposite to the next step.


4. For the erection of scaffolding, first insert the two door frames on the end base, and then install the cross rods to fix them, lock the lock plates, and then set up the future door frames, and then install the cross rods after each kick And lock piece.


5. Portal scaffolding must be provided with reliable connection to the building.


6. Scissors support should be arranged on the outer side of portal steel scaffolding, and the vertical and longitudinal directions should be arranged continuously.


Who we are





Tianjin Huilai International Trade Co., Ltd

TianJin HuiLai International Trade Co., Ltd, founded in 2012, Company is a specializing in the export of galvanized steel pipe, galvanized coil, scaffolding, steel prop, steel plank and other steel products.

TianJin HuiLai International Trade Co.,Ltd is subordinate to TianJin TianYingTai Steel Pipe Group. It is a professional export subsidiary of TianYingTai Steel Pipe Group.

Since its establishment in 2012, TianJin HuiLai International Trade Co., Ltd has export more than 600 thousand tons of steel pipe products. Customer are all over Southeast Asia, the Middle East, Europe, South America, Africa and other places. Products are mainly used in chemical industry, machinery, construction, furniture and other industries.

We have experienced staff to provide our customers with the most professional and considerate service.



Tianjin Tianyingtai Steel Pipe Co., Ltd

Tianjin TianYingTai Steel Pipe Co., Ltd., founded in 2007, is a professional enterprise engaged in steel pipe production.

The company has 14 production lines of various types of galvanized steel pipes, 10 deep processing production lines of steel pipes, and 2 environmental protection hot-dip galvanizing production lines, with an annual output of more than 600000 tons of galvanized steel pipes of various types.

The products are mainly used in agriculture, animal husbandry, chemical industry, machinery, construction, shipbuilding, automobile and other fields.

The company has invested a lot of money to establish a national certified professional test center, which can provide customers with professional and authoritative product test reports.

In order to provide customers with efficient, convenient and low-cost services, the company has invested in the construction of a 20000 square meter indoor fully enclosed modern logistics and warehousing center, equipped with a professional logistics transportation and packing team. It can provide customers with one-stop service of product storage, packing, billing and delivery, with daily packing capacity of 20 - 25 and packing accuracy of 100%


Our commitment




We have sophisticated testing equipment

We have established a fully functional experimental detection center. In order to ensure the quality of products, the chemical elements, mechanical properties, surface characteristics, limit test and other aspects of the product are tested.

We have certification

Our products have passed the Philippine national certification, ISO9001 certification, BSOHSAS18001 certification, EU certification.

High-quality Pre-sale Service and Perfect After-sales Service System

1.Professional Sales Manager to Remove Your Troubles and Solve Your Difficulties.

2.Support customers to inspect products at any time. Welcome customers to visit factory.

3.When problems arise, we should focus on customers and actively assist them in solving them.

All services are designed to make customers more comfortable.


FAQ



1.  Are you trading company or manufacture?

We have our own factory Tianjin Tianyingtai(TYT) Steel Pipe Co.,Ltd, Which is professional manufacture for steel pipe and scaffoldings. After 19 years rapid development, we have 26 production lines for various kinds of steel pipe and annual production more than 1000000 tons

2. How about the delivery time?

10-15 days after receiving the deposit(1*40FT as usual)

We can sent out in 2 days, if it has stock.

We has a modern logistics center with an area of 20000M2 , the daily packing capacity is

20-  25,and the packing accurace rate is 100%

3. How can you guarantee what I got will be good?

We are national High-tech enterprise and have best environmental friendly intelligent factory ,From material to products, we inspect each process to keep quality ,and BV/SGS inspection can be accept.

4. How long does your warranty?

We can assured the quality within 90 days after receiving the cargoes.

5. Can you make the product according to our requirements?

Yes,of course.

6. Can you send a free sample for inspection?

Yes, we can.




Mail consultation

Please feel free to give your inquiry in the form below. We will reply you in 24 hours.